
Secant piling provides an effective solution for excavation support and retaining structures, particularly in constrained developments where ground movement and site boundaries must be carefully managed. A secant pile wall is formed through overlapping reinforced and non-reinforced piles to create a continuous retaining system.
Applications can include basement construction, deep excavations, infrastructure works and developments where neighbouring structures or restricted working space create additional engineering considerations. Our approach integrates pile positioning, installation sequencing, reinforcement and construction control to support the intended retaining function.

Contiguous pile walls consist of closely spaced piles constructed along an excavation boundary. They can provide an effective retaining solution where excavation support is required and site conditions are appropriate for the system.
These solutions are commonly considered for basements, urban construction environments, infrastructure developments and other projects involving significant excavation. Methodology is coordinated according to design requirements, ground conditions and the wider construction sequence.

Sheet piling can provide temporary or permanent ground-retention support for a variety of construction environments. Applications may include excavation support, infrastructure works, waterfront-related construction, temporary works and areas requiring controlled soil retention.
Our team considers installation conditions, surrounding structures, access limitations and the intended application when planning sheet-piling works.

Not every project fits within a standard methodology. Complex construction environments may require specialised foundation or earth-retention approaches developed in response to unique engineering conditions. Nawaloka Piling works collaboratively with project stakeholders to evaluate requirements and determine practical construction methodologies using the resources and expertise available.